The New Port project is a unique example of the development of subarctic oil reserves. Drilling technologies are tested here in the conditions of arctic latitudes and permafrost. To increase the development efficiency, drilling horizontal, double-barrel wells with record-breaking rates is used. For example, a multilateral well was drilled in 19 days. One such well produces up to 400 tons of oil per day – a tangible economic effect. It was also possible to drill a well with a horizontal section of 2000 meters. This figure is also a record for LLC Gazpromneft-Yamal. For the first time in Yamal, the company conducted a multi-stage hydraulic fracturing. Work is underway on a site with complex geology, on Jurassic deposits. 

The Novoportovskoye gas turbine power station is the most powerful on the Yamal Peninsula. The construction will provide electricity to social facilities and production facilities of the Novoportovskoye field, and in the future, the nearest settlements. GTES capacity is 96 MW.

The nearest main pipeline is located 700 kilometers from the field, so LLC Gazpromneft-Yamal began construction of the Arctic Gate oil terminal in the Gulf of Ob. It really became the “gateway” of the Arctic: this is the first step to developing deposits in the Yamal Peninsula, to date, more than 25 licensed sites have been allocated here.